Skip to main content
Drillholes to ground models

Know the ground before you commit to it

Boreholes, CPT, laboratory results, cross sections and 3D ground models — held as governed records with a live hazard and risk register behind pit slopes, dams and foundations.

The ground surface interpolated from 113 collar elevations, with the drillholes and vein shell beneath it.

Target audience

Geotechnical engineers, engineering geologists, exploration and resource geologists, geochemists, and technical reviewers.

Platform capabilities

Industry-standard borehole logs with lithology, SPT, samples and water strikes
Scaled geological cross sections correlated between holes
CPT/CPTu traces with derived parameters and soil behaviour type
3D ground models from boreholes and correlated units
Governed design parameters with validation and provenance
Hazard and risk register with a likelihood–consequence matrix
AGS4 and DIGGS exchange, both directions, with validation
Exploration and assay geochemistry with QA/QC resolved per batch

Business benefits

Put ground evidence in front of the people designing against it
Stop re-keying investigation data between packages and reports
Find and reuse a previous investigation instead of re-commissioning it
Produce report-ready logs, sections and factual reports from one source

Screenshot gallery

The screens that support this workflow, shown in the working application.

Section XS-01 cut through five boreholes, with the interpreted units between them (synthetic investigation).
A digital borehole log drawn from the database — strata, SPT blows, samples and water strike (synthetic investigation).
A cone penetration test as a continuous profile: cone resistance, friction and pore pressure to 15 m (synthetic investigation).
Kinematic screening: the critical wedges drawn on the stereonet against the declared friction angle (synthetic pit).

Compare this workflow with the full platform

Explore adjacent capabilities in AI agents, data management, remote sensing, 3D visualization, and enterprise GIS.

View Features

Request demo

Request a Geoscience & Subsurface demo

Bring your workflow, target users, and data readiness questions. The demo can be tailored to the product areas shown on this page.

Geotechnical & Geoscience Software | Borehole Logs, Cross Sections & 3D Ground Models | SpatialTechSolutions