Skip to main content
Geotechnical module

GeoTech Scientist

Integrated Geotechnical Investigation and Subsurface Intelligence. GeoTech Scientist brings the full ground investigation workflow into one governed platform: plan investigations, capture borehole and in-situ records, manage samples and laboratory results, produce industry-standard logs and cross sections, build 3D ground models, derive and govern design parameters, and generate factual reports — every value traceable to its source record.

The GeoTech Scientist workbench: an investigation map, project context, and analysis panels in one browser workspace.

Product positioning

Integrated Geotechnical Investigation and Subsurface Intelligence

A connected platform for geotechnical investigation — projects, boreholes, in-situ and laboratory tests, logs, GIS, cross sections, 3D ground models, and engineering interpretation in one place.

Key capabilities

Project and site investigation management
Investigation mapping of boreholes, trial pits, and in-situ tests
Industry-standard borehole and trial pit logs
SPT, CPT/CPTu, and field-test records
Samples and laboratory test management
Soil and rock characterization and stratigraphy
Geological cross sections and correlation
3D subsurface and ground models
Governed geotechnical design parameters and interpretation
Geotechnical hazard and risk register
AGS4 and DIGGS data exchange
Factual reports, logs, and deliverables
AI-assisted, governed data queries
Document register with lifecycle states and reviewer approvals
Satellite imagery and terrain analysis (Google Earth Engine, Sentinel-2) inside the investigation workflow
In-app offline field data capture for connectivity gaps in the field

Target users

Geotechnical engineers
Engineering geologists
Field investigation teams
Laboratory teams
GIS professionals
Project managers
Ground engineering consultants
Asset owners

Download the GeoTech Scientist brochure

A print-ready PDF overview of the platform, components, workflow, and applications — ideal for sharing with technical and project stakeholders.

Download PDF Brochure

Component ecosystem

GeoTech Scientist connects the parts of a ground investigation that normally live in separate spreadsheets and tools — so data captured once flows through logging, correlation, interpretation, and reporting.

Project & investigation setup

Organize projects, sites, and investigations, then plan and track boreholes, trial pits, and in-situ tests.

Investigation mapping

Locate every borehole, trial pit, and test on one filterable GIS map with search, symbology, and coordinate readout.

Logging & field records

Capture strata, lithology, SPT, groundwater, core recovery, and drilling records as industry-standard logs.

Samples & laboratory

Track samples from depth to the bench and link laboratory results back to the borehole they came from.

CPT / CPTu & in-situ

Read cone traces with derived parameters and soil behaviour type classification alongside the profile.

Cross sections & 3D models

Correlate units between boreholes and build scaled sections and 3D ground models of the subsurface.

Interpretation & hazards

Govern design parameters with validation and provenance, and maintain a geotechnical hazard and risk register.

Exchange & reporting

Import and export AGS4 and DIGGS, and generate factual reports, logs, and deliverables from the same data.

Connected investigation workflow

From plan to report, on one thread of evidence

Each stage builds on the last, and every result stays traceable to the record it came from.

Step 1

Plan

Step 2

Investigate

Step 3

Test

Step 4

Log

Step 5

Model

Step 6

Interpret

Step 7

Report

Key capabilities

GeoTech Scientist brings the full ground investigation workflow into one governed platform: plan investigations, capture borehole and in-situ records, manage samples and laboratory results, produce industry-standard logs and cross sections, build 3D ground models, derive and govern design parameters, and generate factual reports — every value traceable to its source record.

Plan the investigation and see it on the map

Set up projects, sites, and investigations, then plot every borehole, trial pit, and in-situ test on a single filterable map, with satellite imagery and terrain context (Google Earth Engine, Sentinel-2) available on the same screen. Field teams can keep capturing records in-app during connectivity gaps, syncing back once reconnected — so the map stays the entry point that populates every downstream module.

Turn field and laboratory records into readable logs

Capture strata, SPT, groundwater, and core data, manage samples and laboratory tests, and read CPT/CPTu profiles — all rendered as industry-standard borehole logs with lithology hatching that a reviewer can trust.

Correlate the ground in 2D and 3D

Draw scaled geological cross sections between boreholes and build 3D ground models with lithology, correlated units, and section curtains — so ground conditions can be understood, not just tabulated.

Interpret, govern, and manage risk

Derive and govern geotechnical design parameters with controlled vocabularies, validation, and provenance, and keep a live hazard and risk register with a likelihood–consequence matrix beside the evidence.

Exchange data, ask questions, and produce deliverables

Move data in and out with AGS4 and DIGGS, generate factual reports, logs, and sections, and ask a governed, read-only assistant plain-language questions about the project's data — every answer cites the source records and their date, and never claims engineering sign-off.

Where it applies

Geotechnical data underpins nearly every built asset. GeoTech Scientist supports the investigation and interpretation behind a wide range of civil, infrastructure, and resource projects.

Buildings & foundations
Roads & highways
Bridges
Tunnels
Railways
Dams & embankments
Ports & marine
Airports
Industrial facilities
Mining & resources
Utilities & pipelines
Urban development

Product screenshots

A closer look at the working application — the screens your team will use day to day.

Every borehole, trial pit, and in-situ test located on a single filterable investigation map.
Industry-standard borehole log — lithology hatching, SPT N-values, samples, water strikes, and core recovery.
Correlate strata between boreholes as a scaled geological cross section.
Boreholes, lithology, and correlated units rendered as a 3D ground model.
CPT/CPTu traces with derived parameters and soil behaviour type classification.
Governed geotechnical design parameters with validation, provenance, and controlled vocabularies.
A governed, read-only assistant for scoped, plain-language questions over the project's geotechnical data.
Generate report-ready deliverables — logs, sections, and factual reports from the same data.

Enterprise evaluation

A production evaluation should prove technical fit, governance, deployment model, data readiness, and workflow value before procurement.

Deployment fit

Review cloud, self-hosted, ArcGIS-connected, and open-source GIS integration options before implementation.

Governance model

Validate authentication, data access, audit logging, and review controls with technical stakeholders.

Workflow proof

Walk through investigation setup, borehole and CPT logging, laboratory data, cross sections, 3D models, interpretation, and reporting scenarios.

Adoption plan

Define users, training needs, rollout sequence, success metrics, and implementation responsibilities.

Request demo

Bring your ground investigation into one platform

Talk to us about product fit, implementation scope, integrations, and deployment support.

GeoTech Scientist | Geotechnical Investigation & Subsurface Intelligence | SpatialTechSolutions